VAT rates and installation lead times in Ireland

Supply-only balustrade kits carry 23% VAT. Permanently fixed supply-and-fit installations take 13.5% VAT only when the installer's own material cost does not exceed two-thirds of the VAT-exclusive contract total; otherwise the entire invoice takes 23%. Typical lead time runs 2 to 4 weeks.

Why some fitted glass balustrade invoices charge 13.5% VAT while others legally move to 23%, and how long templating to fitting really takes.

Free, no obligation. One local installer prices it, not five.

  • 13.5% VATsupply & fit if materials <= 2/3
  • 23% VATsupply-only or materials > 2/3
  • 10–14 daysstock straight clear panels
  • 3–4 weeksbespoke raked or drilled glass
Modern bright hallway and staircase fitted with a frameless glass balustrade

How Revenue's two-thirds rule works on architectural glazing

Under Revenue guidelines for construction fixtures, permanently fixed balustrades count as immovable building work eligible for the reduced 13.5% construction VAT rate only if the contractor's cost of materials stays at or below two-thirds (66.67%) of the total VAT-exclusive price charged to the customer. Crucially, the calculation uses the installer's trade cost price of glass and metalwork, not the retail price.

Supply-only glass panels or Juliette kit

VAT rate
23%
Why
Movable goods supplied without installation always take standard 23% VAT.

Labour-heavy timber stair retrofit

VAT rate
13.5%
Why
Site templating, spindle removal and carpentry often keep materials under two-thirds.

High-spec 21.5 mm laminated / coastal 316

VAT rate
Often 23%
Why
Expensive custom laminated glass and machined fittings can breach two-thirds, flipping the whole invoice to 23%.

Subcontractor billing a main builder (RCT)

VAT rate
0% reverse charge
Why
Principal contractor accounts for VAT directly; two-thirds test does not apply.

Always check whether a written quotation states "plus VAT at 13.5%" or "plus VAT at 23%" before comparing two installers: a 9.5 percentage-point gap on a €5,000 terrace equals €475.

Price my balustrade

Four quick taps and our per-metre price shows before we ask for a phone number. One local installer rings you, not five.

Frameless base-channel glass balustrade, around 4.5 m total run, indoors: €2,050 to €2,950, supplied and fitted.

Step 1 of 5

What style of balustrade?

Pick the closest look. The installer confirms glass thickness on site.

How the per-metre guide is worked out

The range multiplies typical Irish supply-and-fit balustrade rates per linear metre by the mid-point of your length band, adjusted for indoor 900 mm versus outdoor 1,100 mm laminated glass and Grade 316 coastal stainless hardware. Juliette balconies are priced per door opening rather than per metre. Complex raked stair flights, core drilling into granite or concrete, frosted or tinted glass and flat-roof waterproofing are confirmed on site. Ask whether VAT is charged at 13.5% or 23%. Only an installer who laser-measures the substrate gives a binding quote.

Week-by-week timeline from enquiry to finished glass

  1. Week 1: site laser survey. Wait until screed, tiles, decking joists or stair stringers are fully finished so finished floor height is locked in.
  2. Week 1 to 2: CAD drawing and sign-off. Complex staircases, raked pitches and standoff hole layouts go through CNC CAD approval before cutting.
  3. Week 2 to 4: cutting, polishing, toughening and lamination. Stock clear straight panels clear processing in 10 to 14 working days; bespoke raked, drilled, curved or opal laminated sheets take 3 to 4 weeks.
  4. Fitting day (1 to 2 days on site). Channels or posts are laser-plumbed and anchored, glass panels lifted into wedges or clamps, handrails seated and silicone or weep trims finished.

Common questions before ordering

Why did one installer quote 13.5% VAT and another quote 23%?

Revenue's two-thirds rule depends on each firm's actual material-to-labour cost ratio. Heavy laminated glass with short straightforward fitting can exceed 66.67% material cost and legally require 23% VAT.

Can I order glass before my patio tiles or timber floor are laid?

Order base channels early if recessing into concrete, but wait until finished floor height and walls are set before finalising glass heights so the installed top edge hits 900 mm or 1,100 mm accurately.

How long does installation itself take once the glass is ready?

A single Juliette balcony or short 4 m landing usually fits in half a day to 1 day. Full staircases with oak handrails or 12 m+ balconies typically take 1 to 2 days.

Do summer or Christmas factory shutdowns affect glass lead times?

Yes. Irish and European toughening and laminating lines slow around the July builders' fortnight and December break, adding 1 to 2 weeks if ordered late.

All balustrade pages and technical guides

Contemporary residential balconies fitted with frameless clear glass balustrades

Check your balustrade cost per metre before a site visit

Select the glass system, approximate run length and indoor or coastal exposure. When you want a measured quote, your outline goes to a single balustrade installer in your county.